Wednesday, August 6, 2008

fuel pump linkage to come from Dodge truck

Kevin Knox and I delivered the power train frame to Piers' shop to prepare for the final install of the race engine (stage 3 motor single turbo) this week end. Here you can see Kevin Knox's bright white arm as he points out the same type of throttle we will use.
I spoke to OTT Industries and the power drive ,o.d and the steer/axles will be ready, Thursday. I will pick up the special landspeed streamliner designed torque distributor tomorrow and hopefully get a meeting at Cool-It and at Eagle Machine with Steve Green. Steve is Bonneville tech inspector.