pitched in to build many components such as the brackets for the indicator lights and control cables. Werner and Kevin were also busy fabricating and wiring things in place. The testing was completed before we loaded out but we learned that electronic parts are not stout enough for industrial strength racers!
Tuesday, September 7, 2010
Preparing the Hawk
pitched in to build many components such as the brackets for the indicator lights and control cables. Werner and Kevin were also busy fabricating and wiring things in place. The testing was completed before we loaded out but we learned that electronic parts are not stout enough for industrial strength racers!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment